Arkansas State University Knowledgebase
Search:     Advanced search
Showing: 1-20 of 20  
Articles
document Evaluation Kit: How can I extend the time the survey is available?
The survey can be extended by changing the End Date in the Project Properties. Login to Evaluation Kit. Select the Project. From the main navigation, click on Project Properties, or select Edit in Project Properties box on the right. Change the End Date. Click on Save.
07 Jan, 2011
document How can I add additional instructors that are not in Banner, or who are not automatically added?
Normal 0 false false false EN-US X-NONE X-NONE 1.       Login to EvaluationKIT. 2.       Select the...
18 Sep, 2012
document How can I reset a student evaluation? How do I know what evaluation to pick?
Normal 0 false false false EN-US X-NONE X-NONE 1.       Login to EvaluationKIT. 2.       Select the...
18 Sep, 2012
document What can I still change in the survey once it has been deployed?
Normal 0 false false false EN-US X-NONE X-NONE 1.       You can change anything in your project, EXCEPT the survey questions. ...
18 Sep, 2012
document How can I extend the time the survey is available?
Normal 0 false false false EN-US X-NONE X-NONE 1.       Login to Evaluation Kit. 2.    0;  Select the...
18 Sep, 2012
document I receive an error when I try to log in, what do I do?
Normal 0 false false false EN-US X-NONE X-NONE Depends on the error, but contact ASU’s main EvaluationKIT Administrator by calling 972-3933 ...
18 Sep, 2012
document I have a list of non-respondents, but how can I get the same list by instructor?
Normal 0 false false false EN-US X-NONE X-NONE This list is only available by course. ...
18 Sep, 2012
document I tried to generate a report, but it never became available. What do I need to do?
Normal 0 false false false EN-US X-NONE X-NONE If a report isn’t immediately available on-screen, an email is sent to the user when it is ready.  Also, you...
18 Sep, 2012
document How can I print off reports for a given course?
Normal 0 false false false EN-US X-NONE X-NONE 1.       Login to EvaluationKIT. 2.       Select Project...
18 Sep, 2012
document Students have told me they have completed the evaluation, but they are still receiving the reminders. What do I need to do?
Normal 0 false false false EN-US X-NONE X-NONE 1.       Login to EvaluationKIT. 2.       From the Dashboard in...
18 Sep, 2012
document If I add new courses to a project after it has been deployed, what will happen?
Normal 0 false false false EN-US X-NONE X-NONE Not a problem.  The surveys for the courses added will adhere to all of the scheduling properties you have...
18 Sep, 2012
document How can I set up an evaluation for a site rather than course?
Normal 0 false false false EN-US X-NONE X-NONE One option is to create a General Survey Project, where there isn’t a course “concept”.  Instead...
18 Sep, 2012
document On our questions, we order the responses as Strongly Agree, Agree, Neutral, Disagree, and Strongly Disagree, but we would like Strongly Agree to be the high score, not the low score. What can I do to set my questions to get what we want?
Normal 0 false false false EN-US X-NONE X-NONE 1.       Login to Evaluation Kit. 2.    0;  Select the...
18 Sep, 2012
document How can I get a summary report for a given instructor?
Normal 0 false false false EN-US X-NONE X-NONE 1.       Login to Evaluation Kit. 2.    0;  From the navigation...
18 Sep, 2012
document One of my students is reporting that Evaluation Kit is giving him an error. What do we need to do?
Normal 0 false false false EN-US X-NONE X-NONE Forward the complete error and user info to ASU’s main EvaluationKIT Administrator by calling 972-3933, who will...
18 Sep, 2012
document One of my students is reporting that everyone else in the class has received the e-mail about Evaluation Kit, but they haven’t received one yet. What do we need to do?
Normal 0 false false false EN-US X-NONE X-NONE 1.       Login to EvaluationKIT. 2.       Select the...
02 Oct, 2012
document One of the instructors is listed on several courses, but really one needs to be evaluated for one or two. How can I remove the instructor from these other evaluations?
Normal 0 false false false EN-US X-NONE X-NONE 1.       Login to EvaluationKIT. 2.       Select the...
02 Oct, 2012
document One of my students is reporting that when they click on the login link, it indicates that no active survey is available. What is the problem?
Normal 0 false false false EN-US X-NONE X-NONE This means the survey period is no longer active.  Typically this is when a student attempts to complete their...
18 Sep, 2012
document Most of my evaluations will begin on the 15th, but I have three courses that won’t be evaluated until the 30th. What do I need to do to set them up?
Normal 0 false false false EN-US X-NONE X-NONE You can specify course-level survey start and end dates.  These dates will override the project-wide dates for...
18 Sep, 2012
document I have a special problem or independent study course that actually meets with another class. Administration would like the student’s evaluations to all be included together. What do I need to do?
Normal 0 false false false EN-US X-NONE X-NONE One approach is to treat the course as a cross-listed course, and do the following: 1.  ...
18 Sep, 2012